Basic Info.
Fuel
Oil Gas Fired Boiler
Burning Style
Internal Firing Boiler
Certificate
CE, Ios9001, ASME, GB
Color
Sky Blue; Metallic Grey
Rated Steam Pressure
1.0/1.25/1.6MPa
Rated Steam Temperature
184/194/204
Transport Package
International Transport Packaging
Specification
According to capacity of the boiler
Product Description
Remote Control EPCB Fire Tube Oil Gas Dual fuel Steam Boiler with CE ISO Certification
1. Features of Gas/oil fired Boilers :
1). WNS series of fuel oil gas-fired boiler uses the standard three return trip technology the entire wet back structure.
2). The furnace transfer and breathing tube radiation heat convection rational design, the layout of adequate heating boilers, high thermal efficiency.
3). This furnace water capacity, full heat exchanger, especially for the medium and large-sized boiler.
4). This furnace used to burn the center of unique technology, the entire wet back structure, the furnace volume is big. make full use of radiation furnace heat exchanger, and through the combustion of fuels burnout level, making boiler thermal efficiency improved greatly.
5). This simplifies the furnace heating surface design, especially for the low-power boiler.2. Advantages of Our Production and Service
1). 100%safety, running stably, excellent water level and pressure control, fully automatic operation
2). Boiler running life > 20years.
3). Good after-sale service. It is free for you to get the damaged spares in the warranty period(1 year) if there are any questions. Assure that we can supply you spares in the boiler's all life.
4). We can arrange an engineer for your company for installation and commissioning and training. If you need us at any time, we can send our technicians and prepare in a short time.
5). Special paint is used after assembly. Paint is particularly used in your climate area, which is anti-corrosion, anti-abrasion, and color-fastness.3. Factory Assurance:
A. Free system design:- lour expert engineers in the field of professional application will design the fuel, boiler structure, boiler room, boiler system and energy-saving scheme for you free.
B. Limitation of time guarantee:- our company has the production workshop with the largest industrial boiler production capacity and skilled professional production workers to ensure the production and supply time.
C. Certification certificate:- We provide a variety of certifications, including CE, TUL, ASME, EAC, GB, etc.
D. Quality assurance- Under the warranty listed in the user manual or manual, if the equipment fails within the warranty period, the company will provide warranty services for the sold products.
E. Warranty service:- Relevant products are 12 months from the date of bill of lading.
- It is free for you to get the damaged spares in warranty period (1 year) if there is any questions. Assure that we can supply you spares in boiler's all life.
4. Mainly Parameters:
Horizontal Oil (Gas)-Fired Steam Boiler Parameter |
| | | | | | | | | | | | | | |
Item\Model | WNS0.5-0.7-Y(Q) | WNS1.0-0.7-Y(Q) | WNS1.5-0.7-Y(Q) | WNS2-0.7-Y(Q) | WNS2-1.25-Y(Q) | WNS3-1.25-Y(Q) | WNS4-1.25-Y(Q) | WNS6-1.25-Y(Q) | WNS8-1.25-Y(Q) | WNS10-1.25-Y(Q) | WNS12-1.25-Y(Q) | WNS15-1.25-Y(Q) | WNS20-1.25-Y(Q) |
Rated capacity kg/h | 500 | 1000 | 1500 | 2000 | 2000 | 3000 | 4000 | 6000 | 8000 | 10000 | 12000 | 15000 | 20000 |
Rated working pressure MPa | 0.7 / 1.0 / 1.25 |
Rated steam temperature ºC | 170 / 184 / 194 |
Design efficiency % | ≥ 92 |
Fuel consumption | light oil kg/h | 37 | 72 | 97 | 144 | 146 | 210 | 285 | 424.8 | 560 | 643 | 833 | 1042 | 1389 |
heavy oil kg/h | 38 | 76 | 105 | 154 | 156.5 | 225.1 | 305.5 | 455.3 | 600.2 | 689.2 | 893 | 1117 | 1489 |
natural gas Nm³/h | 44 | 85 | 116 | 172 | 174.3 | 250.7 | 340 | 507.1 | 668.6 | 767.7 | 995 | 1244 | 1659 |
chimney diameter | ф250 | ф350 | ф350 | ф350 | ф350 | ф450 | ф500 | ф500 | ф600 | ф650 | ф750 | ф800 | ф900 |
Largest transportation size | L (mm) | 1950 | 2400 | 3300 | 3700 | 3400 | 4500 | 4600 | 4800 | 6400 | 7200 | 7150 | 7500 | 9150 |
W (mm) | 1300 | 1670 | 1660 | 2000 | 2100 | 2600 | 2550 | 2750 | 2750 | 3200 | 3200 | 3500 | 4000 |
H (mm) | 1500 | 1890 | 2050 | 2100 | 2368 | 2600 | 2604 | 2950 | 3114 | 3262 | 3500 | 3850 | 4500 |
Notes:This form only for your reference, if any changed, please refer to factory technical documents. |
5. Our Main Product Scope:
1). WNS series Horizontal oil/gas fired boilers (0.5-30T/H, 0.7-14MW)
2). SZS serires Horizontal Oil/gas fired boiler (4- 35T/H )
3). LHS series Vertical Oil/gas fired boiler (0.1-2 T/H, 0.06-0.7MW )
4). DZL new type water fire tube boilers (1-35T/H, 0.7-29MW)
5). SZL series water tube biomass boilers (4-35T/H, 1.4-29MW)
6). SHX boiler boiler ( 10--35 T/H)
7). CFB Circulating Fluidized Bed boiler ( 35T--130 T )
6. Company Information:
Spirit:Supply reliable & high efficient heating system.
Qingdao East Power Industry Equipment Co., Ltd is located in Chinese brand capital-Qingdao, professionally engaged in industrial boilers for 35 years. Our main products include industrial boiler such as coal fired steam boiler, gas fired steam boiler, oil fired steam boiler, thermal oil boiler and power plant boiler such as CFB circulating fluidized bed boiler, pulverized coal boiler and all kinds of pressure vessel, reaction caldron, boiler auxiliary machine and son on.
Our company upholds the business objectives of "professional-based,quality first", and focus on a variety of measures to guarantee each device and each component to be higher than the international relevant standards. And we have be certified by international authority,as well as ASME, CE, ECA Customs Union certification.7. FAQ:Q: Are you a manufacturer?
A: Yes, we are a manufacturer. Our factory is in Pingdu Qingdao established in 1993.
Q: Can I get a guarantee of products?
A: Yes, every product is 1 year quality warranty under customer's correct using the products.
Q: Do you have any Certificates?
A: Yes. Each of our boilers has a China GB certificate. If you need CE ASME or AS, we can help you to get it.
Q: How to buy it?What about the delivery?
A: Please contact me by email or online, let me know your factory situation, I will give you some advice on which model most suitable for you. We have a shipping agent who can choose the cheapest and fastest delivery. FOB, CIF, C&F, or EXW are no problem for us.
Q: How can I pay you?
A: T/T, L/C is very well used.
Q: What about the production?
A: Produce time is 20~25days for <6Ton boiler, 25~40days for >8Ton boiler.
Q: Could you offer some wear parts?
A: Yes, some chain grate bars, electric equipments in control panel box for example.
Q: What about the maintenance?
A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts.
Address:
Minghui international 2-2615, No.39 Shiling Road, Laoshan District, Shandong
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Agriculture & Food, Auto, Motorcycle Parts & Accessories, Industrial Equipment & Components, Instruments & Meters, Manufacturing & Processing Machinery, Metallurgy, Mineral & Energy
Management System Certification:
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME, PAS 28000
Company Introduction:
Qingdao East Power Industrial Equipment Co., Ltd is in line of all kinds of boilers: Fluid liquid and gas fuel boiler series, Solid fuel boiler, Power station series boiler and some boiler accessories. And these boilers are of high quality, environment protected & Energy conserved. It has been approved by the Provincial Environment Department.
And we can manufacture and supply boiler as per CE, ASME, AS standar, also with these certification.
Furthmore, our company can make some Steam turbines and generators, and has become the major boiler auxiliary supplier in Qingdao city, Shandong Province.
Our boilers have been used well in all Chinese regions, also have been exported to Australia (has got their certificate), Thailand, Vietnam, Mexico, Philippine, Kzakstan, Russia, Africa(such as Angora, Uganda, Ethiopia), Latin American, etc. We have been cooperating with USA for vessel project, are cooperating with Spain and Germany company for boler CE project.
Quality control system
Each worker must has the Certificate before joining in and starting work.
Each producing process is marked Work Number of the Workman and Inspector, and input the information to computer procedure. So we can check the person responsible swiftly.
Each welding line is inspected rigorously with radiographic test and X-rays is saved to official file.
Each boiler is tested seriously with water pressure and inspected by the Shandong province Institute of Specific Equipment Inspection and Research, then get the Product Safe Characteristic Supervision Inspect
We offer the products with high quality and competitive price and hope we have a good cooperation with you.